First Bridge for Hickson Trail

Not very beautiful eh?  However, the metal structure is sound and suits the trail’s need beautifully.  Now located at the East Zorra-Tavistock Yard this 4 ton truck trailer bed is waiting to be moved, in the near future, to its permanent site.  There a cement block support, a new wooden floor and wooden railings will all be added as outlined by the Upper Thames River Conservation Authority.  The trailer bed was purchased from Mike Hartstein at the Hog Assembly Yard in Stratford.  Thank you for your good service Mike!

Share this:

Leave a Reply

Your email address will not be published. Required fields are marked *