Steel Posts Being Pre-drilled For Bridges

Seventy steel posts needed either three or four holes drilled in them, depending on their ultimate role, so they would be ready to be installed on one of the two new bridges on the north section of the Hickson Trail.  Thanks to our volunteer!

Share this:

Leave a Reply

Your email address will not be published. Required fields are marked *